Customization: | Available |
---|---|
After-sales Service: | Iws |
Warranty: | 12 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The advantages of double loading movable hopper mainly include the following aspects :
improve loading and unloading efficiency : double truck movable funnel designed for loading and unloading coal cinder, cement powder, iron concentrate powder, grain and other bulk materials. Through the optimization design, such as the installation of dust removal device, electro-hydraulic door device and vibration feeding device, the loading and unloading efficiency is greatly improved .
versatility : This funnel can be customized according to customer requirements to meet the needs of different materials. For example, dust removal devices can be installed to reduce dust pollution, electro-hydraulic door devices to control material flow, and vibration feeding devices to ensure uniform material transfer .
easy operation : funnel design makes the operation simple, through the portal type grab crane PLC control system, the grab can be easily controlled to open and close, to achieve safe and effective loading and unloading .
Keywords: movable hopper, wheel hopper, hopper for grain, ECO hopper, port hopper, hopper load system, dustproof hopper, diesel driven hopper, cement hopper, dedust ECO hopper.
Main features of the eco-hopper | ||
Type of eco-hopper | Tire Mobile Eco-hopper | |
Capacity of eco-hopper | 60m³ | |
Feed material | Cement clinker | |
Density of material | 0.9-1.6 t/m3 | |
Discharge capacity | 500-800TPH | |
Size of upper hopper opening | 6.7m×6.7m | |
Total height of eco-hopper | 11m | |
Hopper wall inclination | ~50° | |
Discharge type | Hydraulic shut-off gate | |
Gantry base distance* span | 9.5m×9.5m | |
Hopper wall material | T8-Q355B | |
Lining board specifications | T6-SUS304 | |
Telescopic loading spout | Electric drive 4kw | |
Air compressor | Screw air compressor, 15KW | |
Hydraulic pump station power | 7.5kw | |
shut-off gate | Cylinder drive control | |
Power supply | Power supply mode | 150KW generator |
Voltage | AC380V 50Hz 3 p+1N | |
Total motor installed | 129Kw | |
Electric control cabinet | IP55,SS304 | |
Eco-hopper Net Weight: | 80 t/set |
The Hopper is too big, in order to save sea freight cost, the hopper will be transport in pcs normally, and will install on site for finally test.blew is some details picture for the ECO hopper install on site.
1.Pre-sale services:
a: Design customized project for clients.
b: Design and manufacture products according to clients special requirement.
c: Train technical personnel for clients.
2.Services during the sale:
a: Help clients to find reasonable freight forwarders ahead of delivery.
b: Help clients to draw solving plans.
3.After-sale services:
a: Assist clients to prepare for the construction scheme.
b: Install and debug equipment.
c: Train the first-line operators.
d: Examine equipment.
e: Take initiative to eliminate the troubles immediately.
f: Provide technical exchanging.
1)How many years of your factory?
We have 20 years production and nearly 10 years experience, we exported to more than 120 countries & regions.
2) Which kind of payment you can be accepted?
Normally both of T/T & L/C at sight are ok for us.
3) How about the delivery time?
7-40 working days after received 30% T/T or L/C.
4) What's your warranty?
Normally is 1 year, if large quantities we can negotiate.
5) What's your MOQ?
MOQ: 1 set
6) Can you accept OEM service?
Yes for sure my friend.
7) Optional Attachment?
Remote Control, Basket, Auger, Grapple, Top Seat, Rear Legs.